OUR PREVIOUS WORK

OTHER
PREVIOUS PROJECT

Explore our range of successful projects, showcasing our expertise in various construction, renovation, and specialized solutions for both residential and commercial sectors.

GOT A LEAK?
DON'T PANIC!

Ponding Test for Waterproofing Assessment

The ponding test is a crucial quality assurance procedure conducted to evaluate the effectiveness of waterproofing systems, especially on flat roofs, balconies, terraces, and wet areas.

In this project, we performed a controlled water ponding test by temporarily sealing all outlets and filling the surface area with water to a specific depth. The water was left to stand for 24 to 72 hours, depending on project requirements, to observe any signs of water leakage, seepage, or system failure.

The test enabled us to confirm the integrity of waterproofing membranes and joint sealing, ensuring that the surface was leak-free and fully protected against future water penetration. Any detected issues were immediately addressed through targeted repairs and retesting.

The ponding test was completed with full documentation, including photos, timelines, and a report for the client’s records — ensuring confidence and compliance with industry standards.

Building Cleanup and Restoration Project

This project involved comprehensive cleanup and restoration services for a building, ensuring the space was left spotless and fully restored to its original condition.

Our team efficiently handled post-construction debris removal, detailed cleaning of all surfaces, and the restoration of any damaged areas. We also addressed any stains, marks, or structural imperfections to ensure the building was in pristine condition.

The services included flooring cleaning, wall cleaning, window washing, dusting and sanitizing, as well as restoration of damaged walls and ceilings. We also managed the disposal of construction waste and non-hazardous materials, ensuring a safe and clean environment.

The result was a fully restored and cleaned building ready for immediate occupancy or further use, delivered within the scheduled timeframe and meeting the highest cleanliness and safety standards.

Completed cementitious coating works to waterproof and protect concrete surfaces, ensuring enhanced durability, chemical resistance, and structural strength.

Playground Floor Mat Supply and Installation

This project involved the supply and installation of high-quality playground floor mats designed to provide a safe, durable, and slip-resistant surface for children’s play areas.

Our team selected the best materials, such as rubber or foam mats, to ensure shock absorption and minimize the risk of injury during play. The mats were carefully laid out and securely fixed to ensure a seamless, even surface that can withstand heavy foot traffic and the elements.

We also ensured that the mats met safety standards and environmental regulations, providing a safe and comfortable play environment for children. Additionally, the mats were easy to maintain and clean, ensuring long-term durability and low maintenance costs for the client.

The installation was completed on time, with attention to detail, ensuring that the playground floor not only enhanced safety but also contributed to the overall aesthetic of the play area.

ELEVATOR PIT Checking & cleaning

This project involved thorough inspection and cleaning of the elevator pit to ensure optimal functionality, safety, and maintenance of the elevator system.

Our team carefully inspected the pit for any signs of debris, water accumulation, or damage to the elevator components, including cables, hydraulic systems, and machinery. The cleaning process included removing dirt, dust, grease, and any foreign materials that could hinder the smooth operation of the elevator.

Additionally, we checked the drainage system to ensure it was functioning correctly and preventing water buildup, which could cause corrosion or electrical issues. All surfaces were disinfected and treated to maintain a clean and safe working environment for the elevator system.

The project was completed with a full inspection report, ensuring that the elevator pit was in proper working condition and met safety standards for continued use.

PLUMBING SERVICE

This plumbing project involved the installation, maintenance, and/or repair of plumbing systems to ensure the efficient operation of water supply and drainage networks. Our team worked on both residential and commercial systems, addressing various plumbing needs from new installations to system upgrades and emergency repairs.

GOT A LEAK?
DON'T PANIC!